Water Supply

Preparation of Detailed Project Report for Various Multi Village Mega Water Supply Projects in various States of India

We have completed assignments of Preparation of Detailed Project Report with Detailed Engineering and Bid Documents for Drinking Water Supply Projects in the below entire Districts –

Ananthapuramu, Vijayanagaram & Kurnool Districts

Survey & investigation, detailed engineering with design of various components, preparation of detailed estimates with documents and drawings, preparation of implementation plan and time schedules etc.

DescriptionVijayanagaram DistrictAnanthapuramu District

No. of schemes Phase – 1

Phase – 2

2 MVS and 1 SVS

22 MVS and 1186 SVS

14 MVS
Treatment Units

14 MLD = 1 No.

22 MLD = 1 No.

13 MLD = 2 Nos.

22 MLD = 1 No.

24 MLD = 1 No.

52 MLD = 1 No.

Pumping MainSize = 75 mm to 500 mm dia. Length = 665 Kms.Size = 75 mm to 800 mm dia. Length = 5063.85 Kms.

 

DescriptionVijayanagaram DistrictAnanthapuramu District
No. of habitations1872885
Design Population44.922 lakhs25.40 Lakhs
Cost of ProjectRs. 1022.00 Cr.Rs. 1903.00 Cr.
Consultancy chargesRs. 561.66 Lakhs

Details of the Schemes executed :

DivisionNo. of SchemesProject Cost (Rs.)
Baksa entire District667583.32 Cr.
Barpeta entire District599610.0 Cr
Tangla entire District1167617.71 Cr
Mangaldai entire District405569.62 Cr
Jorhat entire District200149.35 Cr
Nazira entire District11575.30 Cr
Kokrajhar –II entire District389670.39 Cr
Bongaigaon entire District427490.00 Cr.

It is a matter of pride that among the consultants empanelled, our services are ranked as First by the project authorities and they are contemplating to allot additional schemes to us.

Details of major projects executed are

Division

No. of Villages

Project Cost

Bidar

320

245 Cr.

Tumkur

247

110.0 Cr.

Shimoga

125

85 Cr.

Udupi

237

210.0Cr

Ramnagara

259

123.0 Cr.

Details of major projects executed are

DistrictNo. of SchemesProject Cost (Rs. in Cr.)Villages/FHTC covered
Aravalli27770.12277 villages
Valsad340183.25340 villages

 

Details of major projects executed are

District

No. of schemes

Project Cost

(Rs. in Cr.)

Purba Bardhaman

21

147 CR.

Jalpaiguri

15

200 CR.

 

Among other various projects, we have executed the following assignments of Preparation of Detailed Project Report Group Water Supply & Sewerage Schemes including survey & Investigation, Designing, Drawing and Preparation of Estimates.

  • Project Management Consultancy for Water Supply Schemes in Nashik Division under Jal Jeevan Mission under Maharashtra Jeeven Pradhikaran, Govt. of

Project Cost Rs. 162.74 Crores. 

  • Project Management Consultancy for Water Supply Schemes in Nashik Division under Jal Jeevan Mission under Maharashtra Jeeven Pradhikaran, Govt. of

Project Cost Rs. 52.64 Crores.