Water Supply
Preparation of Detailed Project Report for Various Multi Village Mega Water Supply Projects in various States of India
- Government of Andhra Pradesh :
- Projects Executed under aegis of Andhra Pradesh Drinking Water Supply Corporation, Vijayawada
We have completed assignments of Preparation of Detailed Project Report with Detailed Engineering and Bid Documents for Drinking Water Supply Projects in the below entire Districts –
Ananthapuramu, Vijayanagaram & Kurnool Districts
- Major activities involved
Survey & investigation, detailed engineering with design of various components, preparation of detailed estimates with documents and drawings, preparation of implementation plan and time schedules etc.
- Project Cost of Ananthpuramu District = Rs. 1903 Crores
- Project Cost of Vijanagaram District = Rs. 1022 Crores
| Description | Vijayanagaram District | Ananthapuramu District |
No. of schemes Phase – 1 Phase – 2 | 2 MVS and 1 SVS 22 MVS and 1186 SVS | 14 MVS |
| Treatment Units | 14 MLD = 1 No. 22 MLD = 1 No. | 13 MLD = 2 Nos. 22 MLD = 1 No. 24 MLD = 1 No. 52 MLD = 1 No. |
| Pumping Main | Size = 75 mm to 500 mm dia. Length = 665 Kms. | Size = 75 mm to 800 mm dia. Length = 5063.85 Kms. |
| Description | Vijayanagaram District | Ananthapuramu District |
| No. of habitations | 187 | 2885 |
| Design Population | 44.922 lakhs | 25.40 Lakhs |
| Cost of Project | Rs. 1022.00 Cr. | Rs. 1903.00 Cr. |
| Consultancy charges | Rs. 561.66 Lakhs | |
- Preparation of DPR for 54 Multi Villages and 255 Single Villages Drinking Water Supply Scheme, Dist: Kurnool under Andhra Pradesh Drinking Water Supply Corporation, Govt. of Andhra Pradesh.
- Project Cost Rs. 1449 Crores.
- Urban & Rural Villages = 1320 Nos.
- Urban & Rural Villages = 1320 Nos.
- Government of Assam :
- Projects Executed under aegis of Public Health Engineering Dte., Government of Assam We have successfully completed the assignment of Preparation of Detailed Project Report for Multi Village Water Supply Schemes / Single Village Water Supply Schemes – Retrofitting as well as new schemes in various Districts of State of Assam. The prime scope of activities for the above assignments are
- Preparation of Topographical Survey. Assessment of features of existing water supply schemes, if any. Preparation Detailed Project Report (DPR) elaborating distribution network, preparation of cost estimates of various components involved in the scheme, O&M Cost., etc.
Details of the Schemes executed :
| Division | No. of Schemes | Project Cost (Rs.) |
| Baksa entire District | 667 | 583.32 Cr. |
| Barpeta entire District | 599 | 610.0 Cr |
| Tangla entire District | 1167 | 617.71 Cr |
| Mangaldai entire District | 405 | 569.62 Cr |
| Jorhat entire District | 200 | 149.35 Cr |
| Nazira entire District | 115 | 75.30 Cr |
| Kokrajhar –II entire District | 389 | 670.39 Cr |
| Bongaigaon entire District | 427 | 490.00 Cr. |
It is a matter of pride that among the consultants empanelled, our services are ranked as First by the project authorities and they are contemplating to allot additional schemes to us.
- Government of Karnataka
- We have completed assignments of Preparation of Detailed Project Report for In-Village System Infrastructure – Rural Water Supply Works, under the aegis of Rural Drinking Water & Sanitation Division, Government of Karnataka.
- Preparation of Topographical Survey. Assessment of features of existing water supply schemes, if any. Preparation Detailed Project Report (DPR) elaborating distribution network, preparation of cost estimates of various components involved in the scheme, O&M Cost., etc.
Details of major projects executed are
Division | No. of Villages | Project Cost |
Bidar | 320 | 245 Cr. |
Tumkur | 247 | 110.0 Cr. |
Shimoga | 125 | 85 Cr. |
Udupi | 237 | 210.0Cr |
Ramnagara | 259 | 123.0 Cr. |
- Government of Gujarat :-
- Projects Executed under aegis of Public Health Engineering Dte., Government of Gujrat. We have completed assignments of Preparation of Detailed Project Report for In-Village Water Supply Scheme, under the aegis of Water And SanitationManagement Organization, Government of Gujarat.
- Preparation of Topographical Survey. Assessment of features of existing water supply schemes, if any. Preparation Detailed Project Report (DPR) elaborating distribution network, preparation of cost estimates of various components involved in the scheme, O&M Cost., etc.
Details of major projects executed are
| District | No. of Schemes | Project Cost (Rs. in Cr.) | Villages/FHTC covered |
| Aravalli | 277 | 70.12 | 277 villages |
| Valsad | 340 | 183.25 | 340 villages |
- Government of West Bengal :
- We have completed assignments of Preparation of Detailed Project Report for Piped Water Supply Schemes for Multi Villages under the aegis of Public Health Engineering Directorate, Government of West Bengal
- Preparation of Topographical Survey. Assessment of features of existing water supply schemes, if any. Preparation Detailed Project Report (DPR) elaborating distribution network, preparation of cost estimates of various components involved in the scheme,O&M Cost., etc.
Details of major projects executed are
District | No. of schemes | Project Cost (Rs. in Cr.) |
Purba Bardhaman | 21 | 147 CR. |
Jalpaiguri | 15 | 200 CR. |
- Government of Madhya Pradesh :
- Projects Executed under aegis of Madhya Pradesh Jal Nigam Maryadit, Bhopal.
- Preparation of Topographical Assessment of features of existing water supply schemes, if any. Preparation Detailed Project Report (DPR) elaborating distribution network, preparation of cost estimates of various components involved in the scheme, O&M Cost., etc. following projects –
- Segwal – 1 & 2 Group Rural Water Supply Scheme, Dist: Bharwani. Cost of DPR being 37655.02 lakhs and 92017.72 lakhs respectively. Total Cost Rs. 1296 Crores.
- 580 village are covered
- Capacity of WTP 107.98 MLD & 50.85 MLD.
- Basai Group Water Supply Scheme, Dist: Datia & Cost of DPR being Rs. 51495.41 lakhs.
- 263 village are covered Capacity of WTP 65.85 MLD.
- Bhina & Kurai Group Water Supply Scheme, Dist: Cost of DPR being Rs. 45379.26 lakhs.
- 331 village are covered Capacity of WTP 47.45 MLD.
- Roshani Group Water Supply Scheme, Dist: Cost of DPR beingRs. 2714.83 lakhs.
- 12 village are covered Capacity of WTP 2.15 MLD.
- Nahryai Group Water Supply Scheme, Dist: Vidisha & Cost of DPR being Rs.23893.45 lakhs.
- 188 village are covered Capacity of WTP 24.37 MLD.
- Badamalhara Multi Village Water Supply Scheme, Dist: Chhatrapur. Cost of DPRbeing 21084.57 lakhs.
- 120 village are covered Capacity of WTP 22.65 MLD.
- Preparation of Detailed Project Report and Project Management Consultancy for Group Water Supply Schemes:
Among other various projects, we have executed the following assignments of Preparation of Detailed Project Report Group Water Supply & Sewerage Schemes including survey & Investigation, Designing, Drawing and Preparation of Estimates.
- Project Management Consultancy for Water Supply Schemes in Nashik Division under Jal Jeevan Mission under Maharashtra Jeeven Pradhikaran, Govt. of
Project Cost Rs. 162.74 Crores.
- Project Management Consultancy for Water Supply Schemes in Nashik Division under Jal Jeevan Mission under Maharashtra Jeeven Pradhikaran, Govt. of
Project Cost Rs. 52.64 Crores.